Common Questions
Frequently Asked Questions
Straight answers on pricing, timelines, compliance and project management.
Pricing & Quotes
Pricing & Quotes
How do you price a fitout or renovation?
Every job is quoted as a fixed price based on a site visit or detailed plans, broken down by trade and stage, so you know exactly what you're paying for before work starts.
Is your initial quote free?
Yes. Site visits and quotes are free and typically returned within 24-48 hours.
Do prices change once the job starts?
Only if the scope changes — and if it does, you'll see the variation in writing and approve it before it's carried out.
Do you require a deposit?
Yes, a deposit secures your place in the schedule, with progress payments tied to project milestones, not arbitrary dates.
Timelines
Timelines
How long does a typical commercial fitout take?
Depends on scope, but most commercial fitouts run from 3-10 weeks once approvals are in place; we'll give you a specific program in your quote.
Can you work after hours or on weekends?
Yes, particularly for live retail, hospitality and occupied office sites where trading hours can't be disrupted.
What happens if my project is delayed by council or landlord approvals?
We flag approval dependencies early in the quoting stage and build realistic float into the program so surprises don't blow out your opening date.
Do you guarantee handover dates?
We commit to a program milestone schedule and communicate immediately if anything upstream (approvals, supplier lead times) puts a date at risk — no radio silence.
Approvals & Certification
Approvals & Certification
Do I need a Construction Certificate for a fitout?
Not if the work is approved as complying development. A Complying Development Certificate combines the planning and construction approval, so no separate Construction Certificate is issued. A Construction Certificate follows development consent from council, which is the usual path for new builds and larger works. Your certifier confirms which applies. NSW Government sets out the difference.
What is an Occupation Certificate and when do I need one?
An Occupation Certificate is the certifier's written confirmation that the completed work is suitable to occupy and use. It is needed before you occupy, use or change the use of a building or the part of it that was built or altered (NSW Planning Portal). In practice it is the document that lets you open the doors.
Who appoints the Principal Certifier, the owner or the builder?
The owner, or the person with the benefit of the approval, not the builder. The appointment is made on the NSW Planning Portal at least two days before work starts. The builder's job is to give the certifier what they need and to make every inspection happen on time (NSW Planning Portal).
What is the difference between an interim and a final Occupation Certificate?
A final certificate covers the whole building. An interim or part certificate covers only the part that is complete and safe to occupy, which is how a single tenancy inside an existing building is usually signed off. Fire safety certificates follow the same split: final for the completed building, interim for the part being occupied (Fire and Rescue NSW).
What is a structural design and installation certificate?
Two engineer documents, not one. The design certificate confirms the engineered element is designed to be structurally sound. The installation certificate, issued after the engineer inspects the work on site before it is concealed, confirms it was fixed as designed. Landlords and certifiers typically want both, and they want them to cover every new fixing, not only the headline element.
What fire safety paperwork does a fitout need?
A fire safety schedule listing the essential measures for the work, then a fire safety certificate issued by a properly qualified person who has inspected and tested each measure. The assessments must be done within the three months before the certificate is issued (EP&A Regulation 2021). Fire extinguishers, blankets and tested finishes sit underneath that.
What do finishes have to prove for fire?
Wall, ceiling and floor linings must meet the fire-hazard limits in the National Construction Code. Certifiers ask for test reports for the product as installed, not a marketing data sheet. We collect them before ordering, because a finish with no report is a finish that may have to come out.
Why do missed inspections stop an Occupation Certificate?
The mandatory inspections are a condition of the approval. If one is missed, the certifier must prepare a report and decide whether the work can continue, and the Occupation Certificate cannot be issued until the mandatory inspections are done (City of Sydney). We book every inspection into the programme before the first trade arrives.
Is a food premises fitout different?
Yes. Food and drink premises approved as complying development must follow Australian Standard AS 4674-2004 for design, construction and fit-out, and the business must notify before it trades. A design compliance certificate and a construction compliance certificate both sit in the pack, and the design certificate has to name the right site and the right legislation.
Does a shopping centre landlord have extra requirements?
Almost always. A landlord can hold its own consent, engineering, electrical, waterproofing and pre-trade document requirements on top of the statutory ones, and it can refuse trade until every item is in. Those documents are typically due the day before trade, so we treat that as the real deadline.
Insurance, Licensing & Compliance
Insurance, Licensing & Compliance
Are you insured, and who holds the licences on site?
Brobuilt carries $20 million public and products liability insurance, renewed annually, and the certificate of currency is available on request. Electrical, plumbing and other regulated work is done by licensed tradespeople who issue their own compliance certificates.
Do you need a builder's licence for commercial fitout work in NSW?
NSW has no general builder's licence for commercial building work. The NSW Government licenses general building work on residential premises and specific regulated trades such as electrical, plumbing, gas and air-conditioning. For a commercial fitout, what protects you is the approval pathway, the certifier, licensed trades, insurance and the contract. We run all five. See the NSW Government pages on general building work and licensing for subcontractors.
Do you handle DA and council approvals?
Yes, we run the approvals pathway as part of project management: exempt, Complying Development Certificate or consent, then the certifier, the engineer and the Occupation Certificate. Where a development application is needed, we work alongside your architect or planning consultant and coordinate the build side.
What does it mean to have Brobuilt as head contractor?
Head contractor is the term most clients use; WHS law calls the same role the principal contractor. We take control of the site and the delivery of the project: construction, trades, site safety and the approvals and sign-offs around it. You have one accountable contractor instead of coordinating each party yourself.
Can you manage a CDC, engineering sign-off and food compliance on a food tenancy?
Yes. On Gloria Jean's Mt Druitt we ran the Complying Development Certificate through an accredited certifier, engineer inspections, fire, electrical and plumbing certificates, and food compliance as head contractor, through to the Occupation Certificate. Where a development application is required instead, we tell you at the quoting stage.
Do you work with insurance assessors on repair jobs?
Yes, we regularly liaise directly with loss adjusters and assessors to scope and deliver insurance repair work.
What safety standards do you follow on-site?
All work follows WHS-compliant site practices, including site inductions, signage and protective measures for occupied buildings.
Project Management
Project Management
Will I deal with the same person throughout the project?
Yes — you have a single point of contact from quote through to handover, usually the same person who scoped your job.
How do you keep clients updated during a project?
Regular scheduled updates (frequency agreed upfront), plus direct phone/email access rather than routing through a call centre.
Do you manage other trades (electrical, plumbing, data)?
Yes, full trade coordination is part of our project management service, so you're not managing multiple contractors yourself.
What happens if something is found to be non-compliant once work starts?
We flag it immediately, explain the options and cost implications, and get your sign-off before proceeding.
Commercial Fitouts & Shopfitting
Commercial Fitouts & Shopfitting
Can you fit out a space while it's still trading?
Yes, staged and after-hours delivery is one of our core capabilities for live commercial and retail environments.
Do you have experience with shopping centre management requirements?
Yes, including centre-specific compliance documentation, insurance certificates and induction requirements — see our District 1 project.
Can you deliver a fitout to a fixed lease or opening date?
Yes — programs are built backward from your locked-in date, with liquidated damages risk factored into planning.
Residential & Maintenance
Residential & Maintenance
Do you do smaller residential jobs, or only large renovations?
We take on everything from a single joinery piece to a full kitchen or internal renovation.
Can you match existing joinery, timber or finishes in an older home?
In most cases yes — we assess on-site and source matching or complementary materials.
What's included in a “make good”?
Typically reinstating a tenancy to its base-building condition per your lease — we scope this against your actual lease document, not a generic checklist.
Do you offer ongoing maintenance agreements?
Yes, for commercial and residential clients who want a single trusted contractor on call rather than sourcing new trades each time.
Do you provide a warranty on completed work?
Yes, all work is covered under standard trade warranty terms, outlined in your handover documentation.
Still have a question?
Call 0478 007 472 or send through your project details and we'll come back to you within two business days.